Description
Added on the 29/10/2021 12:00:43 - Copyright : Euronews EN
Berlin, Germany, Feb. 18 EFE / EPA), (Camera: Hayoung Jeon).- Tesla plans for its first electric car factory in Europe faces delay since the Higher Administrative Court of Berlin-Brandenburg will examine a complaint by an environmental group. FOOTAGE OF THE AREA WHERE TESLA'S NEW FACTORY IS EXPECTED TO BE BUILT.
Argentina's President Javier Milei visits the Tesla factory in Austin, United States, with Tesla CEO Elon Musk. IMAGES
Metro, bus and tramway services are at a standstill in Berlin, as in many other German cities, due to a strike by public transport employees. IMAGES
TSMC'S new chip plant in Japan will help to boost the resiliency of global chip supplies, the semiconductor giant's founder Morris Chang said Saturday. The factory "will, I believe, improve the resiliency of chip supply for Japan and for the world," the 92-year-old said at the opening ceremony, in a rare public appearance. SOUNDBITE
An act of "sabotage" targeting communication infrastructure brought rail traffic in northern Germany to a standstill on Saturday morning (8 October), according to rail operator Deutsche Bahn. The halt in service affected the departure of passengers at Berlin's main railway station as, for almost three hours, all high-speed and regional connections in the north of the country, as well as freight traffic, were interrupted. IMAGES
A stranded cargo ship causes river traffic to be halted on the Rhine in western Germany after suffering a technical fault, authorities say. The incident comes at a time when water transport is already suffering as the result of drought, which has caused the water in the river to drop to a level considered inaccessible for shipping. The vessel is stuck at St Goar and Oberwesel, between the cities of Mainz and Koblenz, river police say, adding that they expect to clear the stricken ship within a day. IMAGES